Major Roadwork Scheduled Friday, April 10, through Thursday, April 16

Road work

[Crop of a stock photo on the Caltrans Twitter account]

Press release from Caltrans District 1:

The following scheduled roadwork has been verified at the time of release. Please keep in mind work is weather permitting and subject to change.For updates to this list, visit: QuickMap at http://quickmap.dot.ca.gov, check the California Highway Information Network (CHIN) at https://roads.dot.ca.gov or call 1-800-GAS-ROAD (1-800-427-7623). For information pertaining to emergency roadwork, check QuickMap and the CHIN. 

Del Norte County

  • U.S. 101 (0/3.8) – Utility work is scheduled between Humboldt County Line and Klamath Beach Road weekdays from 7 a.m. to 7 p.m. Lane and shoulder closures will be in effect. Travelers should expect minor slowdowns. LC#C101XC
  • U.S. 101 (3.8/4.6) – K-Rail installation is scheduled between Klamath River Overflow Bridge 1-32 and Route 101/169 Separation 1-26 weekdays from 7 a.m. to 5 p.m. One-way traffic control will be in effect. Travelers should expect 5-minute delays. LC#C101CA
  • U.S. 101 (7.6/8.3) – K-rail work is scheduled between McMillan Road and Peine Road on Friday, April 17 from 7 a.m. to 3 p.m. One-way traffic control will be in effect. Travelers should expect 5-minute delays. LC#C101CA
  • U.S. 101 (12.2/13.8) – Emergency work is scheduled on Friday, April 10 from 6 a.m. to 5 p.m. One-way traffic control will be in effect. Travelers should expect 5-minute delays. LC#C101DD
  • U.S. 101 (35.8/36.5) – The Dr. Fine Bridge Replacement Project is scheduled in the Smith River area weekdays from 7 a.m. to 7 p.m. One-way traffic control will be in effect. Travelers should expect 10-minute delays. LC#C101WA

Humboldt County

  • Route 36 (4.1/4.6) – Construction upgrades near Carlotta are scheduled to continue. One-way traffic control will be in effect. Travelers should expect up to 15-minute delays weekdays from 7 a.m. to 7 p.m. LC#C36IA
  • Route 36 (15.7/16.3) – Slide response west of Grizzly Creek Redwoods State Park will continue. One-way traffic control will continue with delays of up to 15 minutes. Check Caltrans District 1 on social media for updates. LC#T36HA
  • Route 36 (19.6) – Emergency work west of Maple Grove will continue. One-way traffic control will be in effect. Travelers should expect up to 5-minute delays. LC#C36JA
  • Route 36 (34.5) – Bridge work at Butte Creek Bridge 4-116 is scheduled to continue. One-way traffic control will be in effect. Travelers should expect 5-minute delays. LC#C36UA
  • Route 96 (4.7/8.1) – Utility work is scheduled between the turnout at postmile 4.7 and Tish Tang Campground on Friday, April 10 from 7 a.m. to 3 p.m. One-way traffic control will be in effect. Travelers should expect 10-minute delays. LC#C96BA
  • Route 96 (6.6/8.1) – Utility work is scheduled between Sugar Bowl Ranch Road and Tish Tang Campground weekdays from 7 a.m. to 7 p.m. One-way traffic control will be in effect. Travelers should expect 10-minute delays. LC#C96BA
  • Route 96 (14.6/16.8) – Utility work is scheduled between Mill Creek Bridge 4-139 and Rock Chute Viaduct 4-53 weekdays from 7 a.m. to 7 p.m. One-way traffic control will be in effect. Travelers should expect 10-minute delays. LC#C96BA
  • Route 96 (14.6/16.8) – Utility work is scheduled between Mill Creek Road and Rock Chute Viaduct 4-53 on Friday, April 17 from 7 a.m. to 3 p.m. One-way traffic control will be in effect. Travelers should expect 10-minute delays. LC#C96BA
  • Route 96 (15.4/18.8) – Utility work is scheduled between Carpenter Lane and Norton Creek on Friday, April 10 from 7 a.m. to 3 p.m. One-way traffic control will be in effect. Travelers should expect 10-minute delays. LC#C96BA
  • U.S. 101 (54/54.6) – Bridge work will continue between Metropolitan Heights Road and Scenic Way Undercrossing 4-235. Lane and shoulder closures will be in effect. Expect minor traffic slowdowns. LC#C101NE
  • U.S. 101 (74.8/76.1) – Nighttime signal work is scheduled between Herrick Avenue and the south Bayshore Mall entrance nightly from 8 p.m. to 6 a.m. Lane and shoulder closures will be in effect. Travelers should expect 5-minute delays. LC#C101CC
  • U.S. 101 (81.8) – Permit work is scheduled near the Redwood Burl Inc. entrance on Sunday, April 12 from 7 a.m. to 5 p.m. Lane and shoulder closures will be in effect. Travelers should expect 5-minute delays. LC#P101HA
  • U.S. 101 (82.7) – Work is scheduled north of Eureka near the Indianola Cutoff. Access to southbound 101 from Indianola Cutoff remains closed. Use an alternate route and expect minor traffic slowdowns. LC#C101FD
  • U.S. 101 (85) – Work is scheduled between Route 101 and South G Street on Sunday, April 12 from 12 p.m. to 4 p.m. Ramp closures will be in effect. Use an alternate route. LC#X101SA
  • U.S. 101 (114.5/116.9) – Sign work is scheduled between McDonald Creek Road and Dry Lagoon on April 16 and 17 from 7 a.m. to 3 p.m. One-way traffic control will be in effect. Travelers should expect 5-minute delays. LC#C101GE
  • U.S. 101 (121.1/122.2) – Utility work is scheduled between Redwood Creek Bridge 4-28 and Bald Hills Road on April 13 and 14 from 7 a.m. to 7 p.m. One-way traffic control will be in effect. Travelers should expect 5-minute delays. LC#C101XC
  • U.S. 101 (122.9/124.7) – Utility work is scheduled between Prairie Creek Bridge 4-29 and Lost Man Creek Bridge 4-30 weekdays from 7 a.m. to 7 p.m. One-way traffic control will be in effect. Travelers should expect 5-minute delays. LC#C101XC
  • Route 169 (25.8/30.2) – Utility work is scheduled between Coon Creek Bridge 4-219 and Martins Ferry. One-way traffic control is scheduled weekdays from 7 a.m. to 5 p.m. Travelers should expect delays of up to 15 minutes. LC#C169CA
  • Route 254 (18.8) – Slide removal work is ongoing just north of Weott. One-way traffic control will be in effect. Motorists should expect 5-minute delays. LC#C254AA
  • Route 255 (8.6/8.8) – Tree work is scheduled between F Street and the 101 junction in Arcata on Sunday, April 12 from 9 a.m. to 2 p.m. Lane and shoulder closures will be in effect. Travelers should expect 5-minute delays. LC#X255CA
  • Route 283 (0/0.3) – Painting is scheduled at the Eagle Prairie Bridge weekdays from 8 a.m. to 5 p.m. One-way traffic control will be in effect. Travelers should expect 5-minute delays. LC#M283DA
  • Route 299 (8.2/11) – Emergency work is scheduled between just east of the Blue Lake weigh station and North Fork Mad River Bridge 4-194 weekdays from 7 a.m. to 8 p.m. One-way traffic control will be in effect. Travelers should expect 10-minute delays. LC#C299AA
  • Route 299 (31.7) – A right shoulder closure remains in effect near 1.1 mile east of Cedar Creek Road in the Willow Creek area due to emergency work. Expect minor traffic slowdowns. LC#T299GA
  • Route 299 (32.1/32.5) – Work is scheduled west of East Fork Willow Creek Bridge 4-115 on weekdays from 7 a.m. to 5 p.m. One-way traffic control will be in effect. Travelers should expect 10-minute delays. LC#C299LA

Lake County

  • Route 20 (16.6/18.1) – Road work in Lucerne from Grove Street to Ogden Road will continue. One-way traffic control will be in effect and motorists should anticipate up to 10-minute delays. LC#C20TA

Mendocino County

  • Route 1 (30.6/31.3) – Emergency work south of Elk continues. One-way traffic control will be in effect and motorists should anticipate up to 10-minute delays. LC#T1BA
  • Route 1 (60.2/62.2) – Utility work in Fort Bragg at various locations from the Noyo River Bridge 10-176 to Pudding Creek Road will continue. One-way traffic control will be in effect from 8:00 a.m. to 5:30 p.m. Motorists should expect up to 5-minute delays. LC#P1PA
  • Route 1 (75.9/76.2) – Emergency work south of Westport from the Blues Beach Trailhead to the Overlook will continue. One-way traffic control will be in effect from 7 a.m. to 6 p.m. Motorists should anticipate up to 30-minute delays. LC#C1TA
  • Route 1 (78.1/78.4) – Emergency work in Westport at Wages Creek Road continues. One-way traffic control will be in effect from 10 a.m. to 7 p.m. Motorists should anticipate up to 10-minute delays. LC#C1BB
  • Route 1 (82.5/82.9) – Culvert work from north of Hillshore Drive to the Juan Creek Bridge 10-140 continues. One-way traffic control will be in effect from 7 a.m. to 8 p.m. Motorists should expect up to 5-minute delays. LC#C1CB
  • Route 20 (13.2/20) – Utility work at various locations from west of Three Chop Road to the James Creek Bridge 10-102 will begin on Monday, April 6. One-way traffic control will be in effect from 8:00 a.m. to 7:30 p.m. Motorists should expect up to 5-minute delays. LC#C20UA
  • Route 20 (30/31.1) – Utility work in Willits west of the Broaddus Creek Bridge 10-104 will continue. One-way traffic control will be in effect from 8:00 a.m. to 7:30 p.m. Motorists should expect up to 5-minute delays. LC#C20UA
  • Route 20 (33.1/33.2) – Culvert work in Willits from South Street to Walnut Street will continue. Westbound lane closures will be in effect from 8:30 a.m. to 4:30 p.m. and motorists should expect minor slowdowns. LC#P20DA
  • U.S. 101 (10.6/11) – Utility work in Hopland from the Feliz Creek Bridge 10-3 to First Street continues. One-way traffic control will be in effect from 8 p.m. to 6 a.m. Motorists should anticipate up to 10-minute delays. LC#C101JD
  • U.S. 101 (10.6/11) – Utility work in Hopland from the Feliz Creek Bridge 10-3 to Mountain House Road will continue. Southbound lane closures will be in effect from 9 a.m. to 3 p.m. Motorists should expect minor slowdowns in the area. LC#P101IA
  • U.S. 101 (16.4/59.3) – Utility work at various locations from McNab Ranch Road to Route 162 continues with lane closures and minor slowdowns. Motorists should use an alternate route. LC#C101KE
  • U.S. 101 (16.4/59.3) – Utility work at various locations from McNab Ranch Road to Route 162 continues with lane closures and minor slowdowns. Motorists should use an alternate route. LC#C101KE
  • U.S. 101 (50.8/51.5) – Construction work near Schow Road continues. Lane closures will be in effect from 7 a.m. to 3 p.m. and motorists should expect minor slowdowns. LC#C101GA
  • U.S. 101 (72.1/72.7) – Emergency work north of Laytonville at Woodruff Drive continues. Lane closures will be in effect and motorists should anticipate up to 15-minute delays. LC#T101GA
  • U.S. 101 (86.5/87.5) – Emergency work south of Leggett continues. Lane closures will be in effect and motorists should expect up to 5-minute delays. LC#T101GA
  • Route 128 (.1) – Emergency work at Jct Route 1 will occur on Friday, April 10. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#C128JA
  • Route 162 (7.9/8.4) – Bridge work at the Eel River Bridge 10-236 continues. Lane closures will be in effect and motorists should expect up to 10-minute delays. LC#C162HA
  • Route 162 (15.2/16.4) – Emergency work from Laytonville Dos Rios Road to Covelo Road will occur on Friday, April 10. One-way traffic control will be in effect from 8 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#P162DA
  • Route 162 (21.1/21.2) – Emergency work west of Sand Bank Creek will continue. One-way traffic control will be in effect from 7 a.m. to 8 p.m. Motorists should expect up to 5-minute delays. LC#C162NA

*Items in bold indicate updates from the previous week.

Facebooktwitterpinterestmail

Join the discussion! For rules visit: https://kymkemp.com/commenting-rules

Comments system how-to: https://wpdiscuz.com/community/postid/10599/

Subscribe
Notify of
guest

This site uses Akismet to reduce spam. Learn how your comment data is processed.

0 Please improve the conversation by disagreeing thoughtfully and backing your claims with facts
Oldest
Newest Most Voted