Major Roadwork Scheduled Friday, October 18 through Thursday, October 24

Road Work Ahead Public Works BlurPress release from Caltrans District 1:

The following scheduled roadwork has been verified at the time of release. Please keep in mind work is weather permitting and subject to change. For updates to this list, visit: QuickMap at http://quickmap.dot.ca.gov, check the California Highway Information Network (CHIN) at https://roads.dot.ca.gov or call 1-800-GAS-ROAD (1-800-427-7623). For information pertaining to emergency roadwork, check QuickMap and the CHIN.

Del Norte County

  • U.S. 101 (27.9) – Ramp work at E. Washington Boulevard Overcrossing will occur on Friday, October 18 from 9 a.m. to 3 p.m. Northbound onramp work and southbound offramp work will occur on Friday. Motorists should expect minor traffic slowdowns. LC#C101LA 
  • U.S. 101 (30.8) – Ramp work at the Route 199 interchange will occur on Friday, October 18 from 9 a.m. to 3 p.m. Northbound 101 offramp work will occur on Friday. Motorists should expect minor traffic slowdowns. LC#C101LA 
  • U.S. 101 (35.8/36.5) – Construction at the Dr. Fine Bridge near Smith River will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should expect 10-minute delays. LC#C101WA

Humboldt County

  • Route 36 (0.0/2.8) – Construction near Alton from U.S. 101 to Rohnerville Road will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. weekdays. Motorists should expect 15-minute delays. LC#C36AA
  • Route 36 (11/11.5) – Bridge work near Pamplin Grove will continue. One-way traffic control will be in effect. Motorists should expect 10-minute delays. LC#C36UA
  • Route 36 (13.5/17) – Striping work west of Bridgeville will conclude on Friday, October 18. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should expect 15-minute delays. LC#C36BA
  • Route 36 (14.7/19.9) – Striping work east of Bridgeville will begin on Monday, October 21. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should expect 15-minute delays. LC#C36BA
  • Route 36 (25.3/25.4) – Bridge work east of Bridgeville will continue. One-way traffic control will be in effect. Motorists should expect 10-minute delays. LC#C36UA
  • Route 36 (25.6/25.7) – Emergency work near the Caltrans Bridgeville Maintenance Station will continue. One-way traffic control will be in effect from 6 a.m. to 7 p.m. Motorists should expect 5-minute delays. LC#C36DA
  • U.S. 101 (12/16) – Landscape work near Garberville will continue. Lane closures will be in effect from 6:30 a.m. to 4:30 p.m. Motorists should expect minor traffic slowdowns. LC#M101EA
  • U.S. 101 (27.7) – Bridge work near Myers Flat continues. Lane closures will be in effect and motorists should expect minor slowdowns. LC#C101CF
  • U.S. 101 (50.6) – Construction work at South Scotia will conclude on Friday, October 18. Northbound lane closures will be in effect from 7 a.m. to 7 p.m. Motorists should expect minor traffic slowdowns. LC#P101HA
  • U.S. 101 (82.7) – Construction work at the Indianola Cutoff will continue. Southbound 101 access is currently unavailable due to a median closure. Southbound motorists should choose an alternate route. LC#C101FD
  • U.S. 101 (123.8/126.1) – Paving work north of Orick will conclude on Saturday, October 19. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should expect up to 15-minute delays. LC#C101QA
  • U.S. 101 (124/126.1) – Tree work north of Orick will begin on Monday, October 21. One-way traffic control will be in effect from 7 a.m. to 6 p.m. Motorists should expect 5-minute delays. LC#P101HA
  • Route 169 (32.4/32.6) – Construction work west of Lower Weitchpec School Road will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect 10-minute delays. LC#C169BA
  • Route 211 (78.6) – Utility work near Fernbridge Street will occur on Thursday, October 24. Lane closures will be in effect from 7 a.m. to 7 p.m. Motorists should expect 5-minute delays. LC#P211BA
  • Route 254 (6.1) – Utility work at River Road will occur on Wednesday, October 23. Lane closures will be in effect from 7 a.m. to 6 p.m. Motorists should expect 5-minute delays. LC#P254CA
  • Route 299 (1.8) – Drainage work at the Route 200 interchange will begin on Monday, October 21. A full westbound off ramp closure will be in effect from 7 a.m. to 8 p.m. Motorists should choose an alternate route. LC#C299QA
  • Route 299 (5.8/6.2) – Drainage work near Blue Lake will begin on Monday, October 18. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should expect 10-minute delays. LC#C299QA
  • Route 299 (11/11.4) – Construction about 11 miles from U.S. 101 will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect 10-minute delays. LC#C299FA
  • Route 299 (12.5/15.9) – Construction work east of Blue Lake will conclude on Friday, October 18. One-way traffic control will be in effect westbound from 7 a.m. to 5 p.m. Motorists should expect 10-minute delays. LC#C299RA
  • Route 299 (21.5/22.5) – Utility work near Redwood Creek Bridge will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should expect 10-minute delays. LC#C299QA
  • Route 299 (26.8/27.4) – Emergency work near Berry Summit Vista Point will conclude on Friday, October 18. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Travelers should expect 10-minute delays. LC#C299OA
  • Route 299 (30.6/31.6) – Drainage work west of the East Fork Campground will conclude on Friday, October 18. One-way traffic control will be in effect from 6 a.m. to 8 p.m. Motorists should expect 10-minute delays. LC#C299QA
  • Route 299 (31.4/33.1) – Construction work west of the East Fork Campground will continue. One-way traffic control will be in effect. Motorists should expect 10-minute delays. LC#C299LA
  • Route 299 (35.3/37.2) – Utility work west of Willow Creek will conclude on Friday, October 18. One-way traffic control will be in effect from 7 p.m. to 7 a.m. weeknights. Travelers should expect 10-minute delays. LC#P299BA

Lake County

  • Route 20 (1.1/2.4) – Construction work from Blue Lakes Road to Irvine Avenue will continue. One-way traffic control will be in effect from 7 a.m. to 2 p.m. Motorists should anticipate up to 15-minute delays. LC#P20KA
  • Route 20 (8.8/9.2) – Traffic signal work in Upper Lake from Main Street to Government Street continues. Lane closures will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#P20FA
  • Route 20 (13.5) – Traffic signal work in Nice at Sayre Avenue will continue. Lane closures will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#P20FA
  • Route 20 (13.7/13.8) – Traffic signal work in Nice from Keeling Avenue to Howard Avenue continues. Lane closures will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#P20FA
  • Route 20 (14/17.7) – Traffic signal work from Hudson Avenue in Nice to 16th Avenue in Lucerne continues. Lane closures will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#P20FA
  • Route 20 (28.5) – Traffic signal work in Clearlake Oaks at Butler Street continues. Lane closures will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#P20FA
  • Route 20 (30.1/31.6) – Utility work east of Clearlake Oaks from Morine Ranch Road to Jct Route 53 will occur on Friday, October 25. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should expect up to 5-minute delays. LC#P20CA
  • Route 29 (45.1/48.6) – Paving work in Lakeport from the Park Way Overcrossing 14-73 to north of the Nice-Lucerne Cuttoff continues. Lane closures will be in effect and motorists should expect up to 5-minute delays. LC#C29DA
  • Route 29 (47.8) – Road work at the Nice-Lucerne Cutoff continues. A full southbound onramp closure will be in effect from 7 p.m. to 6 a.m. Motorists should expect up to 10-minute delays. LC#C29DA
  • Route 175 (8.2/8.6) – Utility work from Jct Route 29 to Old Lower Lake Road will begin on Monday, October 21. One-way traffic control will be in effect from 8 a.m. to 4 p.m. Motorists should expect up to 5-minute delays. LC#P175BA
  • Route 175 (18.4/19.5) – Utility work in Cobb from Summit Boulevard to the Cobb Village Center will occur on Tuesday, October 22. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#P175BA

Mendocino County

  • Route 1 (31.1/31.6) – Bridge work at the Elk Creek Bridge 10-120 continues. One-way traffic control will be in effect from 7 a.m. to 4 p.m. Motorists should anticipate up to 10-minute delays. LC#C1WA
  • Route 1 (51.4/51.9) – Bridge work north of Mendocino at the Jack Peters Creek Bridge 01-43484 from Lansing Street to south of Road 500D. One-way traffic control will be in effect and motorists should expect up to 10-minute delays. LC#C1VA
  • Route 1 (71.2) – Utility work at Abalobadiah Creek will occur on Tuesday, October 22. One-way traffic control will be in effect from 8 a.m. to 10 a.m. and motorists should expect up to 5-minute delays. LC#C1BA
  • Route 1 (75.4/76.1) – Emergency work south of Westport from the Blues Beach Trailhead to the Overlook will continue. One-way traffic control will be in effect from 7 a.m. to 6 p.m. Motorists should anticipate up to 20-minute delays. LC#C1TA
  • Route 1 (77.2) – Utility work in Westport at Pacific Avenue will occur on Tuesday, October 22. One-way traffic control will be in effect from 11 a.m. to 1 p.m. Motorists should expect up to 5-minute delays. LC#P1BA
  • Route 1 (82.2/82.9) – Road work from the Portal Rock Vista Point to the Devonte Vista Point continues. One-way traffic control will be in effect and motorists should expect up to 5-minute delays. LC#C1BB
  • Route 1 (87.8/103.2) – Sign work north of Rockport from Usal Road to Jct Route 271 in Leggett. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#C1QA
  • Route 20 (33.1/33.2) – Utility work in Willits near Franklin Avenue will occur on Wednesday and Thursday, October 23-24. Lane closures will be in effect from 9 a.m. to 3 p.m. and motorists should expect minor slowdowns. LC#P20AA
  • Route 20 (33.3/34.8) – Paving work from the North Calpella Overcrossing 10-206 to Road A continues. One-way traffic control will be in effect from 7 p.m. to 6 a.m. Motorists should expect up to 5-minute delays. LC#C20BB
  • U.S. 101 (20.7) – Bridge work in Ukiah at the Robinson Overcrossing 10-86 will occur on Sunday, October 20. One-way traffic control will be in effect from 5 p.m. to 6 a.m. Motorists should expect up to 5-minute delays. LC#P101YB
  • U.S. 101 (20.9) – Bridge work in Ukiah at the Robinson Creek Bridge 10-5 will occur on Sunday, October 20. Lane closures will be in effect from 5 p.m. to 6 a.m. Motorists should expect minor slowdowns. LC#P101YB
  • U.S. 101 (30.7/33.8) – Road work north of Ukiah from Route 20 to Uva Drive continues. Lane closures will be in effect from 7 a.m. to 5 p.m. and motorists should expect up to 5-minute delays. LC#C101RB
  • U.S. 101 (30.8) – Bridge work at Route 20 will continue. A full northbound offramp closure will be in effect from 7 p.m. to 5 a.m. Motorists should anticipate up to 15-minute delays. LC#C101WC
  • U.S. 101 (33.7/43.2) – Road work south of Willits from Route 20 to Uva Drive in Redwood Valley will continue. Lane closures will be in effect from 7 a.m. to 5 p.m. and motorists should expect up to 5-minute delays. LC#M101QD
  • U.S. 101 (48.9/55.2) – Paving work near the North Willits Railroad Crossing to Big Trails Drive continues. One-way traffic control will be in effect from 7 p.m. to 6 a.m. Motorists should anticipate up to 20-minute delays. LC#C101SA
  • U.S. 101 (54.9/64.6) – Paving work south of Laytonville at various locations from Big Trails Drive to Sloan Road will begin on Monday, October 21. Lane closures will be in effect from 7 a.m. to 5 p.m. Motorists should expect minor slowdowns. LC#C101BC
  • U.S. 101 (59.3/59.9) – Bridge work south of Laytonville at Jct Route 162 continues. One-way traffic control will be in effect from 1 p.m. to 5 p.m. Motorists should anticipate up to 15-minute delays. LC#C101SB
  • U.S. 101 (63.4/64.6) – Culvert work from the Long Valley Creek Bridge 10-98 to Shamrock Ranch will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate up to 15-minute delays. LC#C101ED
  • U.S. 101 (64.6.9/65) – Paving work south of Laytonville at Shamrock Ranch will begin on Monday, October 21. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#C101BC
  • U.S. 101 (105.4/106) – Landscape work north of the Piercy Separation 10-91 will conclude on Friday, October 18. One-way traffic control will be in effect from 6 a.m. to 4 p.m. and motorists should expect up to 5-minute delays. LC#M101EA
  • Route 162 (.1/1.8) – Paving work from east of the Long Valley Creek Bridge 10-19 to west of the Corral Creek Bridge 10-234 will occur on Friday, October 18. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#C162EA
  • Route 162 (.6) – Utility work at Helms Road will occur on Friday, October 18. One-way traffic control will be in effect from 7 a.m. to 4 p.m. Motorists should expect up to 5-minute delays. LC#P162AA
  • Route 162 (7.9/8.4) – Bridge work at the Eel River Bridge 10-236 continues. Lane closures will be in effect and motorists should expect up to 10-minute delays. LC#C162HA
  • Route 162 (11/12.6) – Road work south of Dos Rios near the Rodeo Creek Bridge 10-237 continues. One-way traffic control will be in effect from 3 p.m. to 7 a.m. weeknights. Motorists should expect up to 10-minute delays. LC#C162IA
  • Route 162 (15.9/17.6) – Paving work from east of Laytonville Dos Rios Road to east of Hosea Creek will occur on Thursday and Friday, October 24-25. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 10-minute delays. LC#C162EA
  • Route 162 (19.4/21.1) – Paving work at Sand Bank Creek will occur on Wednesday, October 23. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 10-minute delays. LC#C162EA
  • Route 162 (22.9/26.4) – Paving work south of Covelo from west of the Round Valley State Historical Landmark to Fairbanks Lane will occur on Monday and Tuesday, October 21-22. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 10-minute delays. LC#C162EA
  • Route 253 (1.7/2.3) – Road work near Boonville at Bald Hills Ranch will continue. One-way traffic control will be in effect and motorists should anticipate up to 10-minute delays. LC#C253DA
  • Route 253 (9.1) – Utility work east of Boonville will occur on Thursday, October 24. One-way traffic control will be in effect from 7:30 a.m. to 10:30 a.m. Motorists should expect up to 5-minute delays. LC#C253CA

*Items in bold indicate updates from the previous week.

Facebooktwitterpinterestmail

Join the discussion! For rules visit: https://kymkemp.com/commenting-rules

Comments system how-to: https://wpdiscuz.com/community/postid/10599/

Subscribe
Notify of
guest

This site uses Akismet to reduce spam. Learn how your comment data is processed.

4 Please improve the conversation by disagreeing thoughtfully and backing your claims with facts
Oldest
Newest Most Voted
Highway 20 is dangerous
Guest
Highway 20 is dangerous
1 year ago

People race at high speeds on a two lane road? On passing lane cars doing 80 mph.

I think I will start walking
Guest
I think I will start walking
1 year ago

Are there any roads not in repair?

Unimpressed
Guest
Unimpressed
1 year ago

These are state roads none of the county
roads are being repaired . Remember the words oh we will legalize pot and all the roads will get paved and our schools will get funded? The reality was not even close.

Unimpressed
Guest
Unimpressed
1 year ago
Reply to  Unimpressed

Well sweet they painted the lines on 36. It was a bit tough after dark there for a bit.