Major roadwork scheduled Friday, January 5 through Thursday, January 11
Press release from Caltrans:
The following scheduled roadwork has been verified at the time of release. Please keep in mind work is weather permitting and subject to change. For updates to this list, visit: QuickMap at http://quickmap.dot.ca.gov, check the California Highway Information Network (CHIN) at https://roads.dot.ca.gov or call 1-800-GAS-ROAD (1-800-427-7623). For information pertaining to emergency roadwork, check QuickMap and the CHIN.
Del Norte County
- U.S. 101 (8.3/8.6) – Bridge work between Peine Road and Old Hunter Creek Road will continue. One-way traffic control will be in effect. Motorists should anticipate up to 10-minute delays. LC#C101KB
- U.S. 101 (14.2/14.7) – Road work north of Rudisill Road in the Last Chance Grade area will begin on Tuesday, January 9. One-way traffic control will be in effect from 7:30 a.m. to 5:00 p.m. Motorists should anticipate up to 15-minute delays. LC#C101IC
- U.S. 101 (22.7/23.8) – Emergency work south of Crescent City from Hamilton Road to Humboldt Road continues. Lane closures will be in effect from 8 a.m. to 5 p.m. and motorists should expect minor slowdowns in the area. LC#C101EB
- U.S. 101 (35.7/36.4) – Bridge work at the Dr. Fine Bridge will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate up to 10-minute delays. LC#C101WA
- Route 199 (19.9/31.1) – Emergency work east of Gasquet from the Grassy Flat Bridge to the Collier Tunnel Rest Area will continue. One-way traffic control is in effect weekdays from 8 a.m. to 4 p.m. Motorists should anticipate up to one-hour delays. LC#T199CA
Humboldt County
- Route 36 (.06/0.5) – Utility work from U.S. 101 to Hillcrest Drive will begin on Tuesday, January 9. One-way traffic control will be in effect from 8 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#C36AA
- Route 36 (11/11.5) – Bridge work from Pamplin Grove to Redwood House Road will continue. One-way traffic control will be in effect from 7 a.m. to 3 p.m. Motorists should anticipate 10-minute delays. LC#C36UA
- Route 36 (25.3/25.4) – Bridge work at Little Larabee Creek will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. LC#C36UA
- Route 36 (37.2/37.4) – Slipout repair near Burr Valley Road will continue. One-way traffic control will be in effect. Motorists should anticipate 5-minute delays. LC#C36DA
- Route 96 (27/27.6) – Construction work near Bluff Creek Road will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. LC#C96LA
- Route 96 (29.9) – Bridge work at Slate Creek Bridge will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate minor traffic slowdowns. LC#C96KA
- U.S. 101 (78.3/78.7) – Road work in Eureka from C Street to J Street. Lane closures will be in effect and motorists should anticipate minor traffic slowdowns. LC#C101HD
- U.S. 101 (88.3) – Ramp work in Arcata at Route 299 will continue. A full northbound on ramp closure will be in effect and motorists should use an alternative route. LC#C101KD
- U.S. 101 (104.9) – The Trinidad Northbound Rest Area is closed for emergency work. LC#T101DA
- Route 254 (3.2/4.3) – Bridge work between State Park Road and Fish Creek Road will continue. A full closure of this portion of highway will be in effect. Motorists should choose an alternate route. LC#C254CA
- Route 254 (4.3/4.8) – Road work north of Fish Creek Road continues. One-way traffic control will be in effect. Motorists should expect 5-minute delays. LC#C254DA
- Route 299 (1.3/4.5) – Road work from west of the Mad River Bridge to east of the Mill Creek Bridge will continue. Lane closures will be in effect from 7 a.m. to 5 p.m. and motorists should expect minor delays. LC#C299HA
- Route 299 (24.3/24.7) – Emergency work near Chezem Road will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate 5-minute delays. LC#C299GA
- Route 299 (32.1/32.5) – Construction work near East Fork Campground will continue. One-way traffic control will be in effect. Motorists should anticipate 5-minute delays. LC#C299LA
Lake County
- Route 20 (10.8/11.4) – Electrical work in Upper Lake from west of Pomo Way to east of Reclamation Cutoff will begin on Wednesday, January 10. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#C20YA
- Route 175 (19.8/20.8) – Tree work in Cobb from Forest Lake Drive to Arroyo Vista Road will continue. One-way traffic control will be in effect from 9 a.m. to 3 p.m. Motorists should expect up to 5-minute delays. LC#P175DA
Mendocino County
- Route 1 (65/65.9) – Road work in Cleone at Mill Creek Drive will continue. One-way traffic control will be in effect from 7:30 a.m. to 5:00 p.m. Motorists should anticipate up to 10-minute delays. LC#C1OA
- Route 1 (75.4/76.1) – Emergency work south of Westport from the Blues Beach Trailhead to the Overlook will continue. One-way traffic control will be in effect from 7 a.m. to 6 p.m. Motorists should expect up to 5-minute delays. LC#C1TA
- Route 1 (104.9/105.5) – Emergency work in Leggett from Jct Route 271 to the South Fork Eel River Bridge will begin on Monday, January 8. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate up to 10-minute delays. LC#C1UA
- Route 20 (39.6/44.1) – Utility work from the Cold Creek Bridge to the Lake County Line continues. One-way traffic control will be in effect from 6 a.m. to 6 p.m. Motorists should expect up to 5-minute delays. LC#C20OA
- U.S. 101 (33.7/43.2) – Road work south of Willits from Route 20 to Uva Drive in Redwood Valley will continue. Lane closures will be in effect from 7 a.m. to 7 p.m. and motorists should expect minor slowdowns. LC#M101QD
- U.S. 101 (92.5/93) – Utility work in Leggett from the Carl Burkey Hall/American Legion Post 815 to the Jitney Gulch Bridge will occur on Tuesday, January 9. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#P101HA
- U.S. 101 (100.4/101) – Utility work in Piercy from the Bear Pen Undercrossing to Rosewarne Road will occur on Tuesday, January 9. Lane closures will be in effect from 7 a.m. to 5 p.m. and motorists should expect minor slowdowns. LC#P101HA
- Route 162 (11/12.6) – Road work south of Dos Rios near the Rodeo Creek Bridge continues. One-way traffic control will be in effect from 3 p.m. to 7 a.m. weeknights. Motorists should expect up to 10-minute delays. LC#C162IA
*Items in bold indicate updates from the previous week.
Join the discussion! For rules visit: https://kymkemp.com/commenting-rules
Comments system how-to: https://wpdiscuz.com/community/postid/10599/