Major Roadwork Scheduled Friday, June 23 Through Thursday, June 29
Press release from Caltrans District 1:
The following scheduled roadwork has been verified at the time of release. Please keep in mind work is weather permitting and subject to change. For updates to this list, visit: QuickMap at http://quickmap.dot.ca.gov, check the California Highway Information Network (CHIN) at https://roads.dot.ca.gov or call 1-800-GAS-ROAD (1-800-427-7623). For information pertaining to emergency roadwork, check QuickMap and the CHIN. For media updates, please contact the appropriate Public Information Officer listed above.
Del Norte County
U.S. 101 (8.3/8.6) – Bridge work between Peine Road and Old Hunter Creek Road will continue. One-way traffic control will be in effect. Motorists should anticipate up to 10-minute delays. LC#C101KB
U.S. 101 (14.8/17.5) – Construction in the Last Chance Grade area will continue. Additional emergency storm clean up work is also in progress. One-way traffic control will be in effect. Motorists should anticipate a total of up to 30-minute delays. LC#C101ID, and C101OC
U.S. 101 (26.1/26.2) – Emergency water line repair south of Front Street will continue. Southbound lane closures will be in effect. Motorists should anticipate minor traffic slowdowns. LC#M101AA
Humboldt County
Route 36 (0.3/1.6) – Utility work west of Hydesville will conclude on Friday, June 23. Lane closures will be in effect between 8 a.m. and 5 p.m. Motorists should anticipate minor traffic slowdowns. LC#C36AA
Route 36 (4.1) – Utility work near Fisher Road will occur on Monday, June 26. One-way traffic control will be in effect from 8 a.m. to 3 p.m. Motorists should anticipate 5-minute delays. LC#P36BA
Route 36 (18.8/19) – Tree work near Van Duzen River Bridge will occur on Monday, June 26. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate 5-minute delays. LC#P36BA
Route 36 (24.4/24.5) – Tree work east of Alder Point Road will occur on Tuesday, June 27. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate 5-minute delays. LC#P36BA
Route 36 (37.2/37.4) – Slipout repair near Burr Valley Road will continue. One-way traffic control will be in effect. Motorists should anticipate 5-minute delays. LC#C36DA
Route 36 (40.6/40.8) – Tree work west of Dinsmore will occur on Tuesday, June 27. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate 5-minute delays. LC#P36BA
Route 96 (27/27.6) – Construction work near Bluff Creek Road will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. LC#C96LA
Route 96 (28.1/28.3) – Bridge work at Aiken Creek Bridge and Bluff Creek Bridge will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. LC#C96KA
Route 96 (29.9) – Bridge work at Slate Creek will begin on Monday, June 26. One-way traffic control will be in effect. Motorists should anticipate minor traffic slowdowns. LC#C96KA
Route 96 (36.8/37.2) – Electrical work near Crawford Creek Bridge will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate 5-minute delays. LC#P96BA
U.S. 101 (17.9) – Bridge work south of Phillipsville will continue. Lane closures will be in effect. Motorists should anticipate minor traffic slowdowns. LC#C101FB
U.S. 101 (27.9) – Bridge work at Myers Flat Bridge will begin on Monday, June 26. Lane closures will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate minor traffic slowdowns. LC#C101ZC
U.S. 101 (66) – Electrical work at Loleta Drive Overcrossing will continue. Full on and off ramp closures will be in effect from 7a.m. to 7 p.m. Motorists should choose an alternate route. LC#C101ZB
U.S. 101 (75.2/78.1) – Various improvements between Herrick Avenue and 5th Street will continue. Lane closures will be in effect from 9 p.m. to 6 a.m. Motorists should expect minor traffic slowdowns. LC#P101HA and C101HD
U.S. 101 (88.8) – Construction work from Airport Road to Bayside Cutoff will continue. Lane closures will be in effect from 8 p.m. to 6 a.m. Motorists should anticipate minor traffic slowdowns. LC#C101FD
U.S. 101 (90.1/109.6) – Striping from the 101/200 junction in McKinleyville to the Big Lagoon area will continue. Lane closures will be in effect from 7 a.m. to 7 p.m. weekdays. Motorists should expect 10-minute delays. LC#C101CA
U.S. 101 (103/112.2) – Storm cleanup between the Trinidad Rest Area and Big Kane Road will continue. Lane closures will be in effect from 6 a.m. to 5 p.m. Motorists should expect up to 15-minute delays. LC#C101ID
Route 169 (27.6) – Bridge work at Rube Creek Bridge will continue. One-way traffic control will be in effect. Motorists should anticipate minor traffic slowdowns. LC#C169AA
Route 169 (32/32.8) – Drainage and paving work north of Weitchpec will continue. One-way traffic control will be in effect from 7 a.m. to 3:30 p.m. Motorists should anticipate 10-minute delays. LC#C169BA
Route 254 (0.5/16.8) – Construction work along Avenue of the Giants will continue. One-way traffic control will be in effect from 6 a.m. to 7 p.m. Motorists should anticipate up to 15-minute delays. LC#C254HA
Route 254 (3.2/4.3) – Bridge work between State Park Road and Fish Creek Road will continue. A full closure of this portion of highway will be in effect. Motorists should choose an alternate route. LC#C254CA
Route 299 (1.8) – Falsework installation at Route 200 will continue. One-way traffic control will be in effect. Motorists should anticipate minor traffic slowdowns. LC#C299CA
Route 299 (1.8/3.8) – Drainage work from Essex Lane Undercrossing to Glendale Overhead Bridge will continue. Lane closures will be in effect from 6 a.m. to 8 p.m. Motorists should anticipate minor traffic delays. LC#C299QA
Route 299 (5.5) – Drainage work at Blue Lake Undercrossing will begin on Monday, June 26. Full on and off ramp closures will be in effect from 6 a.m. to 8 p.m. Motorists should choose an alternate route. LC#C299QA
Route 299 (11/12.5) – Drainage work from North Fork Mad River to Simpson Road will continue. One-way traffic control will be in effect from 6 a.m. to 8 p.m. Motorists should anticipate 5-minute delays. LC#C299QA
Route 299 (22.3/30.6) – Paving work from Redwood Creek Bridge to Cedar Creek Road will continue. One-way traffic control will be in effect from 7 a.m. to 9 p.m. Motorists should anticipate up to 10-minute delays. LC#C299BA
Route 299 (32.1/32.5) – Construction work near East Fork Campground will continue. One-way traffic control will be in effect. Motorists should anticipate 5-minute delays. LC#C299LA
Lake County
Route 20 (2.4/3.2) – Utility work west of Upper Lake near Scotts Valley Road continues. One-way traffic control will be in effect from 9 a.m. to 4 p.m. Motorists should anticipate up to 15-minute delays. LC#C20KA
Route 175 (0.1/0.8) – Road work west of Mathews Road continues. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate up to 10-minute delays. LC#C175GA
Route 175 (22.6/22.9) – Road work at Neft Road continues. One-way traffic control will be in effect from 7 a.m. to 6 p.m. Motorists should expect up to 10-minute delays. LC#C175JA
Mendocino County
Route 1 (62/62.2) – Bridge work in Fort Bragg from Manzanita Street to Pudding Creek Road will continue. One-way traffic control will be in effect and motorists from 9 a.m. to 7 p.m. can expect up to 20-minute delays Monday through Friday and 30-minute delays are anticipated on the weekends. LC#C1OB
Route 1 (77.6/79) – Utility work in Westport at the Wages Creek Bridge will occur on Friday, June 23. One-way traffic control will be in effect from 8 a.m. to 4 p.m. Motorists should expect up to 5-minute delays. LC#P1AA
Route 1 (85.5/86.8) – Utility work will occur north of Hardy Creek on Friday, June 23. One-way traffic control will be in effect from 8 a.m. to 4 p.m. Motorists should expect up to 5-minute delays. LC#P1AA
Route 20 (7/7.5) – Tree work west of Little Lake Road will occur on Friday, June 23. One-way traffic control will be in effect from 7 a.m. to 3 p.m. Motorists should expect up to 5-minute delays. LC#C20BA
Route 20 (15.8/16) – Tree work east of Three Chop Road will occur on Friday, June 23. One-way traffic control will be in effect from 7 a.m. to 3 p.m. Motorists should expect up to 5-minute delays. LC#C20BA
Route 20 (19.1/20.3) – Road work west of Road 300 continues. One-way traffic control will be in effect from 7 a.m. to 6 p.m. Motorists should expect up to 10-minute delays. LC#C20IB
Route 20 (20/25.7) – Tree work west of Three Chop Road will begin on Monday, June 26. One-way traffic control will be in effect from 7 a.m. to 4 p.m. Motorists should expect up to 5-minute delays. LC#C20BA
Route 20 (31.2/32.2) – Utility work at Broaddus Creek will occur on Friday, June 23. One-way traffic control will be in effect from 8 a.m. to 3 p.m. Motorists should expect up to 5-minute delays. LC#P20BA
U.S. 101 (3/5.9) – Road work from Comminsky Station Road to the Pieta Creek Bridge will begin on Friday, June 23. Lane closures will be in effect from 6:30 a.m. to 5:00 p.m. and motorists should expect minor slowdowns. LC#C101KC
U.S. 101 (41.3/43.4) – Emergency work in Willits at Route 20 will begin on Monday, June 26. Lane closures will be in effect and motorists should expect minor slowdowns in the area. LC#C101KA
U.S. 101 (42.3/44.9) – Emergency work in Willits from Water Plant Road to the East Hill Undercrossing will continue. Lane closures will be in effect and motorists should expect minor slowdowns in the area. LC#C101ND
U.S. 101 (84.6) – Culvert work at the Cummings Road Undercrossing continues. A full on ramp closure will be in effect from 7 a.m. to 3 p.m. Motorists should use an alternative route. LC#C101ED
U.S. 101 (93.6/93.9) – Utility work near the Standish-Hickey State Recreation Area will occur on Monday, June 26. Lane closures will be in effect from 8 a.m. to 4 p.m. and motorists should expect up to 5-minute delays. LC#C101GA
U.S. 101 (94.6/96.4) – Utility work at the Dora Creek Bridge will occur on Monday, June 26. Lane closures will be in effect from 8 a.m. to 4 p.m. Motorists should expect up to 5-minute delays. LC#C101GA
U.S. 101 (106.2/.8) – Bridge work from the Lowell Allen Memorial Bridge to Route 271 continues. Lane closures will be in effect and motorists can expect minor slowdowns in the area. LC#C101JD
U.S. 101 (106.5/.9) – Emergency work between Piercy and Benbow near Milkyway Loop Road continues. One-way traffic control is in effect and motorists should expect up to 5-minute delays. LC#T101IA
Route 162 (11/12.6) – Road work south of Dos Rios near the Rodeo Creek Bridge continues. One-way traffic control will be in effect from 3 p.m. to 7 a.m. weeknights. Motorists should expect up to 10-minute delays. LC#C162GA
Route 162 (29.1/30.7) – Road work in Covelo from Howard Street to Mina Road continues. One-way traffic control will be in effect from 7 a.m. to 6 p.m. Motorists should expect up to 10-minute delays. LC#C162AA
Route 253 (1.7/2.5) – Utility work at Singley Cattlepass will begin on Monday, June 26. One-way traffic control will be in effect from 8 a.m. to 5 p.m. Motorists should anticipate up to 15-minute delays. LC#C253DA
Route 271 (.2/.15) – Culvert work near the U.S. 101 Cummings Road Undercrossing will begin on Friday, June 23. One-way traffic will be in effect from 7 a.m. to 6 p.m. Motorists should expect up to 10-minute delays. LC#C271JA
Route 271 (15.8/20.4) – Culvert work in Piercy from south of Bear Pen Road to north of County Road 442B continues. A full lane closure is in effect from 7:00 a.m. to 6:30 p.m. Motorists should use an alternative route. LC#C271EA
Route 271 (19.5/20) – Road work in Piercy continues. A full lane closure is in effect from 7 a.m. to 6 p.m. Motorists should use an alternative route. LC#C271IA
Route 271 (20/20.6) – Utility work in Piercy north of Old Mill Road will occur on Tuesday, June 27. One-way traffic control will be in effect from 8 a.m. to 4 p.m. Motorists should expect up to 5-minute delays. LC#C271AA
*Items in bold indicate updates from the previous week
The following scheduled roadwork has been verified at the time of release. Please keep in mind work is weather permitting and subject to change. For updates to this list, visit: QuickMap at http://quickmap.dot.ca.gov, check the California Highway Information Network (CHIN) at https://roads.dot.ca.gov or call 1-800-GAS-ROAD (1-800-427-7623). For information pertaining to emergency roadwork, check QuickMap and the CHIN. For media updates, please contact the appropriate Public Information Officer listed above.
Join the discussion! For rules visit: https://kymkemp.com/commenting-rules
Comments system how-to: https://wpdiscuz.com/community/postid/10599/
Does CALTRANS never update their info?
The local work on 101 at Phillipsville & Myers Flat has been completed for a month or more.