Major Roadwork Scheduled Friday, December 8 through Thursday, December 14

Press release from Caltrans:Road Work Ahead Public Works Blur

The following scheduled roadwork has been verified at the time of release. Please keep in mind work is weather permitting and subject to change. For updates to this list, visit: QuickMap at http://quickmap.dot.ca.gov, check the California Highway Information Network (CHIN) at https://roads.dot.ca.gov or call 1-800-GAS-ROAD (1-800-427-7623). For information pertaining to emergency roadwork, check QuickMap and the CHIN.

Del Norte County

  • U.S. 101 (8.3/8.6) – Bridge work between Peine Road and Old Hunter Creek Road will continue. One-way traffic control will be in effect. Motorists should anticipate up to 10-minute delays. LC#C101KB
  • U.S. 101 (22.7/23.8) – Emergency work south of Crescent City from Hamilton Road to Humboldt Road continues. Lane closures will be in effect from 8 a.m. to 5 p.m. and motorists should expect minor slowdowns in the area. LC#C101EB
  • U.S. 101 (35.7/36.4) – Bridge work at the Dr. Fine Bridge will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate up to 10-minute delays. LC#C101WA
  • Route 199 (19.9/31.1) – Emergency work east of Gasquet from the Grassy Flat Bridge to the Collier Tunnel Rest Area will continue. One-way traffic control is in effect weekdays from 8 a.m. to 5 p.m. Motorists should anticipate up to one-hour delays. LC#T199CA

Humboldt County

  • Route 36 (11/11.5) – Bridge work from Pamplin Grove to Redwood House Road will continue. One-way traffic control will be in effect from 7 a.m. to 3 p.m. Motorists should anticipate 10-minute delays. LC#C36UA
  • Route 36 (25.3/25.4) – Bridge work at Little Larabee Creek will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. LC#C36UA
  • Route 36 (37.2/37.4) – Slipout repair near Burr Valley Road will continue. One-way traffic control will be in effect. Motorists should anticipate 5-minute delays. LC#C36DA
  • Route 96 (27/27.6) – Construction work near Bluff Creek Road will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. LC#C96LA
  • Route 96 (28.1) – Bridge work at Aiken Creek Bridge will continue. One-way traffic control will be in effect. Motorists should anticipate minor traffic slowdowns. LC#C96KA
  • Route 96 (29.9) – Bridge work at Slate Creek Bridge will continue. One-way traffic control will be in effect. Motorists should anticipate minor traffic slowdowns. LC#C96KA
  • U.S. 101 (0/0.9) – Slipout repair from Route 271 to Hartsook Inn will continue. One-way traffic control will be in effect. Motorists should anticipate minor traffic slowdowns. LC#C101IA
  • U.S. 101 (27.8) – Bridge work at South Fork Eel River Bridge will continue. Lane closures will be in effect. Motorists should anticipate minor traffic slowdowns. LC#C101CF
  • U.S. 101 (77.3/78.5) – Various improvements between Broadway and ‘E’ Street will continue. Northbound lane closures will be in effect from 6 a.m. to 7 p.m. Motorists should expect minor traffic slowdowns. LC#C101HD
  • U.S. 101 (88.3) – Ramp work in Arcata at Route 299 will continue. A full northbound on ramp closure will be in effect and motorists should use an alternative route. LC#C101KD
  • Route 101 (112.5/114.5) – Electrical work near Big Lagoon will occur on Wednesday, December 13. One-way traffic control will be in effect from 8 a.m. to 4 p.m. Motorists should anticipate 5-minute delays. LC#P101AC
  • Route 200 (0.5/2.6) – Tree work between Reserve Road and Route 299 will conclude on Friday, December 8. One-way traffic control will be in effect from 8 a.m. to 5 p.m. Motorists should anticipate 5-minute delays. LC#C254CA
  • Route 254 (3.2/4.3) – Bridge work between State Park Road and Fish Creek Road will continue. A full closure of this portion of highway will be in effect. Motorists should choose an alternate route. LC#C254CA
  • Route 254 (4.3/4.8) – Road work north of Fish Creek Road continues. One-way traffic control will be in effect. Motorists should expect 5-minute delays. LC#C254DA
  • Route 299 (1.8/5.5) – Off ramp repair work west of Blue Lake continues. Full westbound off ramp closures at Route 200, Exit 3B to Essex Lane, and Exit 4 to Glendale Drive, and a full westbound onramp closure at Glendale Undercrossing will be in effect weekdays from 7 a.m. to 6 p.m. Motorists should choose an alternate route. LC#C299HA
  • Route 299 (19.1/24.6) – Utility work west of Berry Summit will begin on Monday, December 11. One-way traffic control will be in effect and motorists should expect up to 10-minute delays. LC#P299BA
  • Route 299 (24.3/24.7) – Emergency work near Chezem Road will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate 5-minute delays. LC#C299GA
  • Route 299 (24.6/26.6) – Utility work near Chezem Road will occur on Tuesday, December 12. One-way traffic control will be in effect overnight from 7 p.m. to 7 a.m. Motorists should expect 5-minute delays. LC#P299BA
  • Route 299 (32.1/32.5) – Construction work near East Fork Campground will continue. One-way traffic control will be in effect. Motorists should anticipate 5-minute delays. LC#C299LA
  • Route 299 (34/43) – Utility work west of Willow Creek will occur on Monday, December 11. Lane closures will be in effect from 7 a.m. to 8 p.m. Motorists should expect up to 10-minute delays. LC#P299BA

Mendocino County

  • Route 1 (.1/.6) – Tree work in Gualala from Center Street to the Mendocino County Line will occur on Tuesday, December 12. One-way traffic control will be in effect from 8 a.m. to 4 p.m. Motorists should expect up to 5-minute delays. LC#P1FA
  • Route 1 (65/65.9) – Construction work in Cleone at Mill Creek Drive will begin on Friday, December 1. One-way traffic control will be in effect from 7 a.m. to 6 p.m. Motorists should anticipate up to 10-minute delays. LC#C1OA
  • Route 1 (75.4/76.1) – Emergency work south of Westport at the Blues Beach Trailhead Overlook will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#C1TA
  • Route 20 (32.8) – Bridge work in Willits at the Broaddus Creek Bridge continues. One-way traffic control will be in effect and motorists should anticipate up to 10-minute delays. LC#C20HA
  • Route 20 (37.9) – Bridge work at the Cold Creek Bridge continues. Lane closures will be in effect from 7 p.m. to 6 a.m. and motorists should expect minor slowdowns in the area. A full on ramp closure will also be in effect. LC#C20HA
  • Route 20 (37.9) – Electrical work at the Cold Creek Bridge will occur on Monday, December 11. One-way traffic control will be in effect from 7 a.m. to 2 p.m. Motorists should expect up to 5-minute delays. LC#C20BA
  • Route 20 (39.1/42.4) – Utility work form the Cold Creek Bridge to Private Road continues. One-way traffic control will be in effect from 6 a.m. to 6 p.m. Motorists should expect up to 5-minute delays. LC#C20OA
  • U.S. 101 (5.9) – Paving work at the Pieta Creek Bridge will begin on Tuesday, December 12. Lane closures will be in effect from 7 a.m. to 5 p.m. and motorists should expect minor slowdowns in the area. LC#C101WD
  • U.S. 101 (10.6) – Paving work at the Feliz Creek Bridge will begin on Tuesday, December 12. One-way traffic control will be in effect and motorists should anticipate up to 10-minute delays. LC#C101WD
  • U.S. 101 (22.1) – Bridge work at the South Ukiah Overhead will continue. Lane closures will be in effect and motorists should expect minor slowdowns in the area. LC#C101WD
  • U.S. 101 (31.8) – Bridge work at the Forsythe Creek Bridge will continue. Lane closures will be in effect from 5 p.m. to 7 a.m. and motorists should expect minor slowdowns in the area. LC#C101WD
  • U.S. 101 (33.7/43.2) – Road work south of Willits from Route 20 to Uva Drive in Redwood Valley will continue. Lane closures will be in effect from 6 a.m. to 5 p.m. and motorists should expect minor slowdowns. LC#M101QD
  • U.S. 101 (92.5/93) – Utility work in Leggett from the Carl Burkey Hall/American Legion Post 815 to the Jitney Gulch Bridge will occur on Thursday, December 14. One-way traffic control will be in effect from 7 a.m. to 5 p.m. and motorists should expect minor slowdowns. LC#P101HA
  • U.S. 101 (100.4/101) – Utility work from the Bear Pen Undercrossing to Rosewarne Road will occur on Thursday, December 14. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#P101HA
  • Route 162 (11/12.6) – Road work south of Dos Rios near the Rodeo Creek Bridge continues. One-way traffic control will be in effect from 3 p.m. to 7 a.m. weeknights. Motorists should expect up to 10-minute delays. LC#C162IA
  • Route 162 (16.6/17.5) – Emergency work west of Laytonville Dos Rios Road continues. One-way traffic control will be in effect from 7 a.m. to 4 p.m. Motorists should expect up to 5-minute delays. LC#T162BA
  • Route 162 (28.2/30) – Electrical work in Covelo from Wattenburg Road to the Cal Fire Covelo Fire Station will continue. One-way traffic control will be in effect from 7 a.m. to 3 p.m. Motorists should anticipate up to 15-minute delays. LC#C162CA
  • Route 271 (19.5/20) – Road work in Piercy continues. A full lane closure is in effect from 7 a.m. to 6 p.m. Motorists should use an alternative route. LC#C271IA

*Items in bold indicate updates from the previous week.

Facebooktwitterpinterestmail

Join the discussion! For rules visit: https://kymkemp.com/commenting-rules

Comments system how-to: https://wpdiscuz.com/community/postid/10599/

Subscribe
Notify of
guest

This site uses Akismet to reduce spam. Learn how your comment data is processed.

0 Let us come and reason together. Isaiah 1:18
Oldest
Newest Most Voted
Inline Feedbacks
View all comments